Skip to content
ES Contact
Back to the portfolio

MEP coordination · Concept study

A duct crossing.

In plan, a beam and a duct cross at one point. Their elevations and the gap between their faces determine whether both can occupy that part of the building.

Axonometric view of a blue duct crossing beneath a beam. A marks the beam, B the duct and C the gap. A dashed line shows the higher route.
Axonometric view of the crossing · Conceptual demonstration · Dynamic VDC Studio · R04 · Nov 2026 · Not to scaleOpen the full-size drawing

Reading the drawing

Does it fit below?

Compare the dashed route with the blue duct. The section reveals which face of the beam limits the opening and which clearance both disciplines would need to review.

A Beam
The underside of the beam defines the top of the available opening in this section.
B Duct
The dashed outline indicates a position that intersects the beam. The blue duct shows a lower alternative.
C Clearance
The free space is measured between the two facing surfaces. A project review would also account for insulation, supports and the use of the space below.
Open the section through the crossing
Section showing a dashed position intersecting beam A, an alternative duct B below, and the vertical gap marked C.
The dashed position and the lower route are two options for the same schematic crossing.Open the full-size section